Rollback plan before a release
Prompt for a rollback plan before a release: measurable triggers, steps, handling of data changes and checks afterwards. Paste it into an AI tool of your choice, which then writes the rollback plan.
- Topic
- Apps & prototypes
- Type
- Prompt
- Level
- Intermediate
- Time
- about 8 min
Results depend on the tool, the model and what you enter.
Result preview
Example: written by our editors, not real AI output.
Change: new "delivery note" field at checkout, new column delivery_note. Triggers (15 minutes after start) – checkout error rate above 2% – order response time above 1.5 s – more than 3 failed payments in 10 minutes Rollback 1. Feature flag off (1 min, on-call) 2. Redeploy previous version (8 min) 3. Column stays; the old version ignores it Stable when: error rate below 0.5% for 30 minutes. Open: do reports already read the new column?
Fill in
What you type stays in this browser window. We store and send nothing.
- containers with gradual switchover
- classic server with a deploy script
- serverless functions
- mobile app through the store
- feature flag in a web app
- new database column
- changed format of stored data
- no data changes
- renamed table
- new events in the queue
Your prompt
You have edited the prompt. Changes in the fields above no longer overwrite it.
This is an instruction for an AI, not the result itself.
Where this prompt works
These AI tools are a good fit for this prompt:
How to use it
- Fill in the fields or tap a suggestion. Leave out names, addresses and other personal data.
- Copy the finished prompt into an AI tool of your choice.
- Walk through the plan with the person running the release and test the rollback once in a test environment.
Why does this work?
Planning the rollback before the release makes decisions faster and calmer in an emergency. The question about data already written uncovers the most common reason rollbacks fail.
Tips
- Mobile apps have no real rollback; plan a server-side switch or a block for the new feature instead.